Create Accounting completing with Warning and incorrect output format.

Conc Jobs are getting into warning with output generated in XML tags in place of desired format.

There was a OPP issue. After recycle from front end resolve the issue.



Comments

Popular posts from this blog

How to set up the Oracle Wallets in Oracle Database 19C

PRVG-11250 : The check "RPM Package Manager database" was not performed because

Change Password in an Oracle Database

How to use JPXImporter in EBS12.2

How to drop index and before dropping it how to get the DDL.

Linux OL7/RHEL7: PRVE-0421 : No entry exists in /etc/fstab for mounting /dev/shm

ORA-00257:archiver error, connect internal only until freed

ALTER PACKAGE COMPILE Statement

Verifying Daemon “Avahi-Daemon” Not Configured And Running …FAILED (PRVG-1360)